Wentworth Hotel | Perth, Australia

Wentworth Hotel | Perth, Australia

Existing Revit Survey from Point Cloud | Wentworth Hotel – Perth, Australia Survey Conducted: BIM - Building Information Modelling Essential for projects that require a reliable BIM-ready Survey Originally Published: 27th March 2017 | Re-published: 19th...
Buried Obstruction Survey – Becket Primary School

Buried Obstruction Survey – Becket Primary School

Buried Obstruction Survey – Becket Primary School Written by: J. Jackson | Published: 3rd September 2024 Becket Primary School got in contact with us after they began excavations and hit what was suspected to be a foundation slab. They reported that there may be...
Buried Obstruction Survey – Pear Tree Primary School

Buried Obstruction Survey – Pear Tree Primary School

Buried Obstruction Survey – Pear Tree Primary School Written by J. Jackson | Published: 9th September 2024 We were contacted by Pear Tree Primary School to conduct a buried obstruction survey as a precaution before they began excavation. Our findings from this...
St. Paul’s Cathedral

St. Paul’s Cathedral

St. Paul’s Cathedral, London      Measured Aerial Drone Survey Written by J. Jackson | Published: 5th April 2024 | Updated: 5th September 2024 Our team was contacted to carry out a measured survey of the exterior walls and the roof of St. Paul’s Cathedral by...
Becket Primary School – PAS 128 Utility Survey

Becket Primary School – PAS 128 Utility Survey

PAS 128 Survey in Derby Topographical and utility survey for Becket Primary School in Derby Written By J. Jackson | Published: 14th March 2024 | Updated: 5th September 2024 PAS 128 Utility Survey PAS 128 is a set of guidelines designed to standardise the way...