Buried Obstruction Survey – Becket Primary School

Buried Obstruction Survey – Becket Primary School

Buried Obstruction Survey – Becket Primary School Written by: J. Jackson | Published: 3rd September 2024 Becket Primary School got in contact with us after they began excavations and hit what was suspected to be a foundation slab. They reported that there may be...
Buried Obstruction Survey – Pear Tree Primary School

Buried Obstruction Survey – Pear Tree Primary School

Buried Obstruction Survey – Pear Tree Primary School Written by J. Jackson | Published: 9th September 2024 We were contacted by Pear Tree Primary School to conduct a buried obstruction survey as a precaution before they began excavation. Our findings from this...
Becket Primary School – PAS 128 Utility Survey

Becket Primary School – PAS 128 Utility Survey

PAS 128 Survey in Derby Topographical and utility survey for Becket Primary School in Derby Written By J. Jackson | Published: 14th March 2024 | Updated: 5th September 2024 PAS 128 Utility Survey PAS 128 is a set of guidelines designed to standardise the way...
Nottingham Cotton Mills – 3D Measured Building Survey

Nottingham Cotton Mills – 3D Measured Building Survey

Surveying Nottingham’s Historic Cotton Mills Measured Building Survey in Nottingham SolidPoint Surveying Nottingham’s Historic Cotton Mills for Student Accommodation Written by J. Pegg | Published: 13th July 2022 | Updated: 5th September In March 2022, we...